Foundation work is scheduled to begin today; our immediate decision is Harper's additional window. Check the dated camera against the schedule before raising an exception; no routine foundation-team confirmation is requested.
Chris / Michelle — today: Chris prefers adding one window in Harper's room, pending Michelle’s final decision before the foundation opening is finalized; none in the rec room. Delay risks a later opening change. The October 29 supplier prices were $1,299.64 for a single casement or $1,627.68 for double-wide, each plus HST; complete installed scope remains to confirm.
Michelle — before tomorrow's design discussion: review the updated bathroom, timber edges/stains and fireplace/nook choices in the Michelle review. Chris's eased preference was sent yesterday, with your final say explicit. Pick the images to share with Meghan. Maibec samples have been received; the portal shows exterior-finish signoff targeted for November 23.
Chris / Pav / broker — this week: continue the personal transfer, obtain the updated date/funds statement, and coordinate insurance at handover. HST research is retained as background; no further routine HST chase or research hold. Refresh Mendacity's bank cash and expected incoming funds for its closeout plan.
Alyssa / accounting: implement the agreed well/fill-pad allocation and credits; identify the $2,360.00 cottage extras commitment before HST and remaining road/corporate costs. Reconcile the final window order with the current drawings and decisions. Road topping belongs to the cottage under Chris’s November9 direction, allowing Mendacity closeout; ledger implementation remains to verify.
Meghan: arrange the closer Mississauga Goemans contact. Kitchen timing is due for discussion November 10 after our bathroom feedback; do not chase a new meeting while we owe responses.
| Including HST, portal read November 9 | Cottage | Mendacity |
|---|---|---|
| Projected total | $1,679,668.36 | $227,883.62 |
| Posted payments | $202,310.33 | $213,345.08 |
| Forecast less posted payments, unreconciled | $1,477,358.03 | $14,538.54 |
Forecasts increased $2,666.80 and $5,268.47 respectively since last Monday. Cottage increase matches a $2,360.00 before-HST extras commitment; its description is unverified. Mendacity's increase reflects $4,662.36 more projected cost before HST. Invoice 26-1906 is paid and posted once; nothing further is due on it.
These remainders are not invoices or certified cash requirements. The well still appears under Mendacity; allocation, credits and remaining road scope remain unreconciled. Outside PattyMac, the historical $34,456.48 transfer tax/legal statement awaits Pav's update. The old bank balance is not today's cash. Retainer is fully applied and Normerica refund received.
November 9 schedule: foundation November 9–December 2; framing December 7–January 18; overall completion July 28, 2027. Published 0% is not proof of actual start. Window/source/model discrepancies need review, not an automatic order release. Reported tree protection in AI site notes is not a final root-safety assessment.
Alyssa correspondence is held until Chris understands the window issues: financial reconciliation, window coordination and the mandatory gas tankless request. No duplicate paid-invoice, answered rate or timber-viewing request. Nothing sent.
Evidence reviewed through November 9: 14 days of correspondence and group texts, plus last three sent weeklies. Text extraction used the November 9 phone backup; latest imported message remains November 6 at 15:12. After Chris signed in, both portal budgets/summaries and schedules were refreshed November 9, with accounting syncs dated November 9. Values and key dates are unchanged from November 8. No actual start or new approvals inferred.
Chris now prefers one large Oriel window; his two-casement preference is withdrawn. Chris now prefers the reference-led Type D C-channel stair family, with substantial timber treads/handrail and slim steel posts; Michelle’s final choice remains pending. All exposed steel must receive the same treatment within each comparison. Current Design Register, Michelle’s decision hub and all tools / role journeys collect the current work. Revised stair D1/D2 models and comparative images are delivered. Combined nook/window/fireplace and consistent all-steel photographic comparisons remain pending. Michelle retains final aesthetic decisions.
Chris prefers an additional woods-facing casement in Harper’s Bedroom3, pendingMichelle; no new rec-room windows. Chris accepts the existing basement casement appearance. The window study now illustrates each issue and locates W007/E102 in its selector. Michelle’s11:30 email agrees with eased timber edges; stains remain separate. Chris’s tasks: develop Oriel options forMichelle and a raised-fireplace / bench with firewood below study, checking adjacent space, nook and entry flow. The Alyssa draft asks one question per numberedpoint and remains forChris review.
Black and rust/patina exposed steel have equal weight forChris, consistently applied to all exposed members in each alternative. Chris prefers the reference-led TypeD C-channel stair family with substantial timber treads/handrail and slim steel posts; the revised D1/D2 comparison is delivered and Michelle’s final choice remains pending. Chris prefers firewood storage under the existing side bench. Add a distinct raised-fireplace/front-seat option, confined to the fireplace frontage, retaining existing side bench/storage and examining the adjoining nook and entry flow. No installation or new gate approval is recorded.
The additional raised-fireplace/front-seat option C now has two native model views and dimensioned plan/elevation. Existing side bench and under-bench logs are retained. Appliance raise/seat heights are illustrative; installation and use during firing remain technical questions, not approved details.