Reviewed 2026-11-16 for week of 2026-11-16.
Foundation work is visible; finish appliance choices and reconcile the increased Mendacity forecast.
Weekly email sent: Chris sent the November16 email at06:36. The five questions await replies; no duplicate send or new follow-up draft is needed. Read the actual sent correspondence.
Confirmed: Rumford1000, black steel beams, dark brown wood beams and kitchen direction (November12); Harper’s additional woods-facing casement and the most recent primary washroom layout (Chris confirms November15). Eased timber edges agreed November9.
Michelle action: send the still-unsent Oriel/fireplace questions to Nada. Chris discussed the direction at the Cottage Life show; the written follow-up remains outstanding.
Still open: lining (grey-herringbone interest, RunningBond quoted), explained D1 stairs, siding in person, roof and other unanswered choices. Bookshelves wait for cost/material options; limewash can wait. Coordinated plans/order still require technical review; the confirmed layout choices are not re-asked.
Short follow-up and latest preferences
| Item | Chris preference | Michelle / next step |
|---|---|---|
| Living-room wood fireplace | Prefer Renaissance Rumford1000 | Rumford1000 confirmed by Michelle November12; lining not final |
| Living-room steel beam | Prefer BLACK POWDER-COATED finish on ALL exposed architectural steel, including the firewood-cubby steel liner to match the beams | Black steel confirmed by Michelle November12 |
| Additional basement windows | Prefer one additional CASEMENT on WOODS-facing wall of Harper’s Bedroom3; NONE in recroom | Confirmed by Michelle per ChrisNovember15: one additional woods-facing casement in Harper’s room; no extra rec-room windows |
| Primary ensuite | Prior preference retained; reviewing MeghanNovember3 revision with later storage-tower removal and current house integration | Most recent primary washroom layout confirmed by Michelle perChrisNovember15 |
| Oriel / nook window | Prefer smaller projecting Oriel with two operable side casements and retained Great Room casement; below-seat area matches the interior wall for a floating appearance | Direct owner clarification: projecting Oriel preferred; pushed-wall picture window fallback only |
| Exterior siding | Undecided; inspect alternatives in person; Maibec samples RECEIVED | Final signoff pending; alternative thermal wood comparison remains optional owner input |
| Roof appearance | Prefer budgeted modified-bitumen roof WITHOUT granule upgrade | Selection pending |
| Interior stairs | Prefer D family: dark C-channel + substantial warm timber treads/handrail + slim steel posts, closer to supplied reference; previous chunky timber posts rejected | Not final: Michelle November12 asks what D1-c means; Chris November12 supplied explanation |
| Small gas fireplace | Prefer current three-sided nook GAS stove appearance with shaped stone ledge option A and separate log pocket; proposed Ortal75TS study basis, product/installation and engineering unverified. | No new Michelle decision recorded |
| Masonry / ceilings / floors / appliances | Retain documented sourced furniture, Hisense Canvas, island and bronze bar accents. Continuous entry stone through boot-room walking/removal area and black kitchen tapware are explicit owner directions. R15/R17 continuous ceiling-to-beam underside is a conditional study, pending Alyssa/Nada; no structural movement or engineering acceptance. | No new Michelle decision recorded |
| Firewood storage / fireplace seating | Prefer current R13 black-steel Rumford bench, green-grey cushion/bolsters and split-wood bays, plus separate nook ledge/log pocket. Rumford geometry unchanged. | No new Michelle decision recorded |
| Current integrated living layout | Keep floated rust loveseat and larger olive upholstered chair as starting preference, with both matching owned early JH501s. Bring fireplace bench into a cohesive conversation. Bar-to-nook through-walkway is no longer required. R16/R17 crosswise shared-table result awaits review. | No new Michelle decision recorded |
| Current convertible bar | Prefer full alcohol display as default, stationary coffee-related folio with20miniatures, sculptural tequila/wine/silver service; retain Flair49PRO espresso and three conversion/operating states. | No new Michelle decision recorded |
| Current interior staging | Earlier four-photo staging request retained as history; no new images before actual3D measurement validation | November14 measurement-first hold; appearance preferences preserved, old image qualifications withdrawn |
| Timber finish | Prefer dark brown timbers; eased edges agreed | Dark brown beams confirmed November12; exact stain and rough/smooth texture remain open |
| Bookshelves / limewash | Earlier material preferences remain studies pending cost and Michelle | Bookshelves ON HOLD for cost/material variety; limewash quote first and can wait |
Decision studies · Full design and model book · Preferred images · All images · Materials comparison · Property Studio
Measurement-first hold: current full models and previous images remain available as unvalidated design history. No new image before actual3D measurement validation; technical QA is not owner approval.
Earlier studies remain accessible. They do not override current choices or the measurement hold.
• Review the coordinated 3D configurations
• Open the preferred alcohol configuration and full-house 3D
• Review the staging photographs and comparisons
• Review the November12 interior revisions
• Open the stair comparison and reference-led refinement
• Compare the delivered nook study
• Compare the delivered steel finish study
• Open the preferred images (Nov 11, fourth review)
• option C
• images
• images
• images