| Surface | Before | After |
|---|---|---|
| Bridge console | “FUNDING: cottage retainer intact $178,832.29” | “Cottage retainer: $178,832.29 is our reconstruction from invoice 26-1712 (2026-09-04), unconfirmed by the portal, pending ASK-8 [Q].” |
| Owner-site headline | “Deposit remaining” with an obsolete invoice-26-1673 tooltip | “Cottage retainer reconstruction [Q]”, with invoice 26-1712, date and ASK-8 in the tooltip and full caveat nearby. |
| Site narrative | “The retainer was intact and undrawn until Sept 4” and “Retainer now $178,832.29” | The invoice-based reconstruction remains unconfirmed; booked supplier costs and the portal invoice-tab message cannot prove a drawdown. |
| Brief generator | “Deposit remaining $178,832.29” | The same complete reconstruction caveat used by the bridge. |
| Operational ledger | “Deposit remaining” | “Reconstructed retainer [Q]”, invoice/date and ASK-8 identified. |
| Combined money | “TOTAL left …; new cash …”, combined forecast/cash headlines and a Total row | Removed, including the combined object in derived bridge data. Cottage and Mendacity are displayed separately. |
| Cottage cash-after-retainer scenario | Unqualified “new cash after deposit” | “Illustrative … after reconstructed retainer [Q, ASK-8]”; never represented as a confirmed cash requirement. |
| CO-8 rule flag | “APPROVED CO FAILS CHECKS — investigate or restate” | Expected missing-quote documentation failure, approval stands; ASK-64 remains. Any additional arithmetic or scope failure still raises a red flag. |
Only the second occurrence of each duplicated ID changed. The original foundation, Bayroc insurance, demolition, payment-posting and confirmation-protocol records retain ASK-80–84.
| Old second occurrence | New ID | Topic |
|---|---|---|
| ASK-80 | ASK-96 | Masonry quantity takeoff |
| ASK-81 | ASK-97 | Bay-window depth explanation — answered September 24 |
| ASK-82 | ASK-98 | Box-beam quote including installation |
| ASK-83 | ASK-99 | Siding information |
| ASK-84 | ASK-100 | Fireplace details and pricing |
ASK-82's demolition record and mandatory flag are preserved. The closed masonry-scope record now points to ASK-96. Current master draft, design register and generated outputs use the corrected identities. The pre-edit master draft is retained under `docs/archive/ALYSSA_MASTER_EMAIL_before_2026-09-25.md` as historical evidence; original sent correspondence and verbatim handoff memories are not rewritten.
• Retainer source read directly: `docs/Drive_Sync/05_COMMUNICATIONS_LOG/INVOICE_26-1712_from_Patty Mac Inc_.pdf`, September 4. Plumbing $20,551.17 plus fee $616.54 gives the listed $21,167.71 retainer application. Subtracting that from the recorded original $200,000.00 produces $178,832.29. The portal running balance remains unconfirmed.
• Payment source read directly: `docs/Drive_Sync/05_COMMUNICATIONS_LOG/Receipt_TD_BPY_from_Patty_Mac_Inc (2).pdf`, September 21. It records $41,001.01 paid against invoice 26-1759; portal posting remains unverified.
• Contract forecasts use the existing source-attributed contract, change-order, allowance, direct-cost and probable-option records. The latest summarized portal reading is September 22; underlying cost-code snapshots contain older dates. No fresh portal reconciliation or new approved reallocation is claimed.
• Mendacity's recorded model excludes unresolved additional budget adjustments and cannot establish a final cash requirement while ASK-82 is open. The requested scope transfer has not been executed. Normerica refund receipt is explicitly unconfirmed by Chris's September 25 direction; no refund is newly credited.
• Demolition arithmetic for the draft: $42,741.16 less $21,959.60 = $20,781.56 before HST; multiplied by 1.13 and rounded to cents = $23,483.16; overrun = 94.63%. This arithmetic checks the recorded September 22 figures, not a fresh portal reading. The separate fee and error-code amounts do not by themselves prove a complete adjustment reconciliation.
The September 24 app transcript was read in full. The recap email itself contains no minutes text. Chris's September 25 reply requests a plain-text transcript, so accessible builder-record delivery remains partial. ASK-97's explanation is answered; no final order dimension or room gate was approved. See the separate design meeting review for the remaining asks.
Chris deleted the Claude Monday task. The replacement Codex task runs Mondays at 07:00 Eastern. September 28's brief is prepared September 25 and must be refreshed on Monday. Drive sync succeeded; one older Google-document shortcut, “Normerica Design notes”, was not found through the Drive API. Link extraction completed without publishing private links.