  "status": "qualified-study-ready",
  "native_frame_findings": [
    "Reviewed all eight v4 native frames: entry 18/22, south elevation 19/23, junction 20/24 and wide Great Room 21/25. Corresponding views preserve apparent geometry, furnishings, timber, masonry, glazing and lighting while changing the architectural steel finish.",
    "SB104 now has a continuous web without the four provisional stiffeners. SB103 changes consistently with SB104; C103 remains concealed by the transom wall.",
    "The grey-green interior band is replaced by plaster in both Great Room views. Clerestory recesses and the wood ceiling remain visible; no new concrete spatial defect is apparent.",
    "The entry close-ups show SB105 spanning between the porch side walls, with two unchanged timber members above it and no continuous inferred infill.",
    "The full south view places SB105 within the recessed entrance beneath the low porch roof, separate from the taller opposing shed roofs. The left deck guard also visibly changes finish, contradicting the inventory statement that exterior guards are outside all cameras.",
    "The firewood cubby is visible in the wide views, but its small, shadowed liner is insufficient for a confident face-by-face visual finish confirmation."
  ],
  "inventory_findings": [
    "S102 explicitly identifies SB103 and SB105 as exposed steel to be powder coated. SB105 is source-supported and was omitted from original R30. No additional explicitly exposed scheduled finished-Great-Room beam is identified in the supplied sheets.",
    "SB104 exposure follows the study direction; S102 does not explicitly designate it exposed. C103 and the wall-, pier-, floor- and roof-enclosed members reasonably remain class B.",
    "SB105 works as the transverse beam across the open south edge of the recessed porch, bearing at built-up posts within its side walls. A102 locates that porch; A200 shows the dark beam band and timber ends; S103 supports the decorative-timber interpretation. Exact timber bearing and attachment remain coordination details.",
    "The current finish count reconciles arithmetically: 54 beam faces + 816 stair faces + 5 cubby-liner faces + 2340 exterior-guard faces + 6 concealed C103 faces = 3221.",
    "The cubby liner is correctly added to class A, but its duplicate class D entry saying constant is obsolete. SB105's inventory note also incorrectly retains the removed infill.",
    "Removed stiffeners, shear tabs, bearings, plates, welds and bolts remain explicit class C omissions. The S102 stiffener requirement remains unresolved despite their owner-directed removal from the appearance model.",
    "Product frames, appliances, lighting and furniture hardware can remain constant as class D; decorative timbers and nailers/packouts belong in class T."
  ],
  "numeric_findings": [
    "SB104: length 717.44\u2212373.36 = 344.080in versus scheduled 343.875in, +0.205in; depth 18.000 versus nominal 18.100in, \u22120.100in. Top Z269.500\u2212floor Z138 = 131.500in, matching the scheduled level. Centreline Y273.760.",
    "SB103: length 502.08\u2212273.76 = 228.320in versus scheduled 230.750in, \u22122.430in; depth 10.000 versus nominal 10.330in, \u22120.330in. Top Z296.500\u2212138 = 158.500in matches the scheduled level. Centreline X544.720.",
    "C103: 5\u00d75in section centred X544.720/Y273.760 aligns internally with the beam junction. Model height 286.5\u2212269.5 = 17.000in versus plate-inclusive schedule length 16.625in, +0.375in; separate plates are absent.",
    "SB105: length 508.61\u2212388.49 = 120.120in versus scheduled 120.125in, \u22120.005in; depth 248.5\u2212236.6 = 11.900in. Top is 110.500in above the main floor, matching the schedule; underside is 98.600in above it. North-south registration remains approximately 3.6in different from the cited structural trace.",
    "The 7.5in timber depth above SB105 would reach Z256.000 from Z248.500, approximately 0.125in below the registered Z256.125 soffit. Timber spacing is scaled, not dimensionally certified.",
    "The new plaster face is at X374.620, 0.220in roomward of the retained fascia at X374.400, covering Z256.120\u2013274.640. Its top remains below the TW106/TW107 openings beginning at Z282.",
    "The lake pier is 556.48\u2212532.96 = 23.520in wide; SB103 is centred within it and ends 1.200in beyond its interior face. This does not resolve the scheduled beam-length discrepancy.",
    "TW103\u2013105 have four reveals each spanning Y270.48\u2013278.48, an 8in wall depth. The corrected roof underside is approximately 0.13833in above the registered wood ceiling.",
    "The supplied south camera specifies 55\u00b0 horizontal FOV and 1536\u00d71024; the other three specify 80\u00b0 and 1440\u00d7960. Corresponding option anchor projections agree."
  ],
  "required_spatial_corrections": [],
  "qualifications": [
    "Qualified only for the bounded finish appearance study. No new visible spatial defect requires correction before finishing; dimensional, structural and installation certification is not established.",
    "Full paired option face records are not supplied. The common local records, matching projections and native pairs support finish-only consistency locally; hashes and declared counts alone cannot independently prove whole-model equality or all 48830 unchanged faces.",
    "Correct the contradictory inventory notes for the cubby, removed porch infill and now-visible exterior guards. The wide-camera purpose also incorrectly promises an exposed C103 post.",
    "Show the stiffener-free beam as an owner-requested appearance condition with the S102 requirement unresolved. Owner direction does not authorize structural omission.",
    "SB103 length, C103 assembly height, simplified beam sections, porch registration, scaled timber spacing, connections, nailers, fire protection and SB104 exposure remain explicit coordination items.",
    "The supplier excerpt verifies TW106/TW107 entries, including duplicate TW107 wording; it does not independently establish every TW103\u2013105 dimension.",
    "Temporary study fill is not a proposed building light. Projection anchors can be occluded and do not establish visibility or final photographic fidelity.",
    "Chris's November 10 black-powder-coat preference supersedes the older equal-preference wording. Rust/patina remains a comparison option requiring a compatible coating specification; Michelle's final selection and owner geometry approval remain pending."
  ]
}