  "status": "qualified-study-ready",
  "native_frame_findings": [
    "Entry pair 16/19 now clearly shows SB105 changing from black to rust/patina. The previous porch visibility failure is resolved.",
    "Junction pair 17/20 shows the SB104 web stiffeners in the matching option finish. SB103 and SB104 change consistently; C103 remains concealed behind plaster.",
    "Wide pair 18/21 preserves the visible timber, masonry, glazing, furniture, ceiling, lighting and perspective. No unintended spatial difference is apparent.",
    "SB104 reads at full depth from the Great Room; clerestory recesses and the wood ceiling remain visible. No new concrete spatial defect is identified in these six frames."
  ],
  "inventory_findings": [
    "Class A reasonably includes SB103, study-exposed SB104, porch SB105, provisional SB104 stiffeners and assumed-metal stair spindles. Class E correctly separates exterior architectural guards outside these cameras; class T correctly separates timber nailers/packouts.",
    "C103 and the wall-, pier-, floor- and roof-enclosed scheduled members reasonably remain class B. Connection plates, welds, bearings and shear tabs remain explicit class C omissions; any exposed portions must inherit the option finish.",
    "S102 explicitly identifies SB103 and SB105 as exposed/powder coated. SB105 was omitted from original R30 and is now represented. No additional explicitly exposed finished-Great-Room scheduled beam is identified; SB104 exposure remains a study condition requiring architectural confirmation.",
    "The finish inventory reconciles to 3240 faces: 54 beam faces, 24 stiffener faces, 816 stair faces, 2340 exterior-guard faces and 6 concealed C103 faces.",
    "Window/door product frames, appliance finishes, furniture hardware and lighting may remain constant. The firewood liner's treatment remains an expressly unresolved scope choice."
  ],
  "numeric_findings": [
    "SB104: model length 344.080 versus scheduled 343.875in, difference +0.205in; depth 18.000 versus nominal 18.100in, difference -0.100in. Top Z269.500 minus floor Z138 equals scheduled 131.500in. Centreline Y273.760.",
    "SB103: model length 228.320 versus scheduled 230.750in, difference -2.430in; depth 10.000 versus nominal 10.330in, difference -0.330in. Top Z296.500 minus floor equals scheduled 158.500in. Centreline X544.720.",
    "C103: 5\u00d75in section centred X544.720/Y273.760 aligns internally with both beams. Height 17.000 versus scheduled plate-inclusive 16.625in, difference +0.375in; separate plates are absent.",
    "SB105: length 120.120 versus scheduled 120.125in, difference -0.005in; top Z248.500 gives scheduled 110.500in above floor. Approximately 3.6in north-south source-registration difference and soffit infill remain inferred.",
    "Four provisional stiffeners are 0.375in thick, span Z252\u2013269 between SB104 flanges and meet its web on both sides. Their centres align with the approximate C103 wall centrelines.",
    "Lake pier width is 23.520in; SB103 is centred within it and extends 1.200in beyond its interior face. This is a buried end, not evidence resolving its scheduled length discrepancy.",
    "TW103\u2013105 each have four reveals across the 8in wall depth. The corrected roof underside lies approximately 0.13833in above the registered wood ceiling."
  ],
  "required_spatial_corrections": [],
  "qualifications": [
    "Ready only for a bounded steel-finish appearance study. SB103 length, C103 assembly height and simplified section depths remain discrepancies, not dimensional passes or verified bearing allowances.",
    "The supplied common local geometry and native pairs support finish-only consistency in these views. Complete paired option face records are absent, so whole-model equality and the declared 48828 unchanged faces cannot be independently confirmed from hashes/counts alone.",
    "Exterior guards and most stair steel are outside the six-frame coverage; their finish assignment is declared rather than visually demonstrated here.",
    "Camera poses and corresponding anchor projections agree across pairs despite different camera hashes. Projection roundtrips do not prove visibility, complete scene equality or final photographic fidelity.",
    "Correct the camera descriptions: C103 is concealed; these views demonstrate the exposed stiffeners, not an exposed HSS post.",
    "The supplied supplier page identifies TW106/TW107 and a duplicate TW107 entry; it does not independently verify all TW103\u2013105 dimensions.",
    "Shop connections, nailers/packouts, fire protection, SB104 exposure, porch registration/infill and coating specification remain coordination items. Rust/patina must be represented as a compatible specified finish, not uncontrolled corrosion.",
    "Black and rust/patina retain equal preference. Michelle's final decision, owner geometry approval and photographic acceptance are not inferred."
  ]
}