DRAFT ONLY — Muskoka coordination addendum, November15. Nothing sent or approved. Alyssa / Nada: 1. Confirm actual dressed timber profiles, T1/T2/T3/T8 base/notch/top details and the shaft/plate split in the S200 total column lengths. The model now preserves all six primary plan footprints and differing scheduled assembly lengths; those boxes are not fabricated shafts/joints. The T4/T7 overall envelope base follows the nominal lower datum; confirm actual pier/baseplate set-out and loading. 2. Coordinate the minimum8x10DouglasFir perimeter members, their 7.5in drawn plan width, the108.5in beam underside, R1ceiling118.125in, roof-layer/lining depth and connections. The model's9.625in vertical beam envelope is a coordination study, not a selected dressed section. 3. Confirm the unselected three-season screen/weatherwall and single-door/collapsible-screen product, profiles, track/threshold, swing and final opening. A200front's4ft knee datum and A102nominal wall/infill planes have been restored. West profile remains inferred. The historical E102slider is superseded;36x84in remains only a working single-door allowance. Earlier bathroom, steel/ceiling, Oriel, curtain framing and occupied-operation questions remain open in the v23book/current register. Oriel remains preferred pending Nada; OptionC remains separate fallback. No construction/purchase/owner approval.