DRAFT ONLY — nothing sent; no owner or engineering approval. Current source findings supersede historical open-question wording. 1. Nada / Alyssa / Meghan — common roof, timber, steel and finish section Scheduled SB103 top 158.5 in andSB104 top 131.5 in are restored. Coordinate rolled profiles, C103 plates/cut, full-width nailer thickness, timber bearing/exposure, services, finish-floor build-up and the intentional fully flush/below kitchen-entry ceiling. Current flush study is 113.39 in above nominal main; it is not an engineered detail. 2. Nada / supplier / Alyssa — current Oriel shop box and support Oriel remains preferred pending viability. Reconcile 72 x 72 in programme,20 in email projection plus 5.5 in jamb, SIDE31.5/CENTER63 quote modules, actual frame/trim envelope, support, operable returns and adjacentW108. Current exact profile is inferred. Option Cis an independent fallback; do not change the Rumford without a separate decision. 3. Alyssa / Matt / Nada — revised tagged window/order and installation section The marked sketch resolves 589 mm horizontal bank gap and 63.5 mm vertical frame separation; those questions are not still unknown. Need current tagged shop/set-out/RSO/sill/head/frame-glass profiles, separator/support/shear-stud detail, W007 addition and proposed Harper window. Retain two 60 x 28.875 in TW106/TW107 units; extra 60 x 30 line was removed. E101 width 131.75 in is explicit, retained 96.5 in head is not final. E00444 in ICF/39 in framed/38 in frame widths are distinct; blockout height/bucks/anchorage remain open. 4. Nada / Meghan / Alyssa — primary bathroom finish registration and basement lining chain Later I104149.5 x 138 in room ends 0.12 in inside the earlier south partition face when its north finish is registered. Confirm final finish/backing or source adjustment without rescaling fixtures. Separately resolve mechanical 15 in printed composite versus 13.25 in F2 plus 2 in B1=15.25 in; preserve each layer and its source. 5. Meghan / millworker / installers — actual product and occupied operation checks Finish full-size cabinet/door/runner/lever/user sweeps and loaded supports for five espresso/alcohol states, all three large trays,15 juleps/two buckets and collector book; maintain beautiful closed coffee cover. Final appliances/plumbing, gas stove/fire clearances, bunk deployment, simulator swing, stairs/guard/channel and glass partition attachment remain to coordinate. Do not replace nominal envelopes with fabricated fit. 6. Project team — property/common datum Use the current November 13 curated exterior brief and GEEKOMworking source. Establish a common building/property transform and measured thresholds/ground/root/landing levels. Historical designed route profiles and internal numeric fits do not establish surveyed ground, permissions or construction-ready access.